One senior team builds it, to the spec we agreed
Positioning, the sales process, systems, brand or the website: whatever the strategy calls for gets built in parallel by the same people. You review at set checkpoints, and you're never the one managing the project.
You walk away with:
The work, built to the exact spec we agreed on. No scope creep. No surprise invoices.
Typically weeks 3 to 7
- When
- Typically weeks 3 to 7
- Your time
- Checkpoint reviews and quick decisions
- Run by
- One senior in-house team
- You get
- The work, built to the agreed spec
Handoffs are where good strategy gets lost
In a lot of projects, the strategist hands a deck to a copywriter, who hands words to a designer, who hands files to a developer. Each handoff loses a little of the original intent, and by launch the site says something nobody quite decided.
We keep it in one room. The people who wrote your strategy stay on the build, messaging and design move together, and engineering starts while the design is still settling, so problems surface early instead of in week seven.
And because the scope is agreed in writing before we start, you know the price. If something new comes up, we size it and you decide. Nothing gets added quietly.
Five workstreams, one team, three checkpoints
A typical Conversion System build. Hover or tap a workstream to see what happens in it. Your proposal sets the real dates.
- Checkpoint 1, end of week 3: Structure and message direction
- Checkpoint 2, end of week 5: Design and copy review
- Checkpoint 3, end of week 7: Finished work on staging
Messaging and copy
Headlines, page copy, proof and calls to action, written from the strategy.
How a change gets handled, so the price never drifts
- 1You spot somethingA new idea, a missed page or a change of mind. It happens on every project.
- 2We size it in writingWhat it involves, what it would change and what it would cost, before anyone starts on it.
- 3You decideAdd it, swap it for something already in scope, or park it for after launch.
- 4Then it's builtOnly once you've agreed, and it goes into the change log so nothing is a surprise later.
How the build moves from plan to finished work
- 1Week 3StructureInformation architecture: which pages exist, what each one is for and the path a buyer takes through them. This is where the hesitation map turns into a layout.
- 2Weeks 3 to 5Messaging and copyThe strategy becomes real words: headlines, page copy, proof, calls to action and form wording, written to be scanned by busy buyers.
- 3Weeks 4 to 6DesignDesign built around the copy and the decision it supports, using a reusable design system your team can extend later without us in the room.
- 4Weeks 5 to 7Engineering and integrationsDevelopment, CRM and form connections, speed and accessibility work, all on a private staging site you can click through at any time.
- 5End of week 7Final checkpointThe finished work, checked against the spec and the strategy, ready for launch testing.
Who does what in Build
Your part
- Feedback at agreed checkpoints
- Quick decisions when we need one
- One consolidated set of comments per review
Our part
- Messaging, design and copy
- Engineering, integrations and CRM
- Progress shared at every checkpoint
- Keeping the scope and the price where we agreed
Finished work you can click through before anyone else sees it
By the end of the build, everything below is done and waiting on a private staging site.
- 01A site built on the strategyEvery page has a job, and every headline traces back to the argument we agreed.
- 02Copy that sounds like your best salespersonWritten for scanning buyers, with proof next to every claim.
- 03A reusable design systemComponents your team can use for new pages without starting from scratch.
- 04Working integrationsForms, CRM and booking connected and tested, so leads land where your team works.
- 05Speed and accessibility built inFast pages and accessible markup from the start, rather than patched on at the end.
- 06A written change logAnything that changed from the original scope, sized and approved in writing.
What a strategy-led build feels like from your side
The same four phases, sized to the job
Go deeper on this phase
From our articles
- The website redesign checklist, starting before the designEverything to settle before, during and after a rebuild.
- What a B2B website redesign really costsReal ranges, what drives them and where budgets go wrong.
- Site speed is a revenue lever, not a tech detailWhy fast pages sell more, and what actually makes them fast.
Free tools and worksheets
Questions about the Build phase
Get a fixed price before a single pixel moves.
On a free call, up to an hour, we talk through what your build would include, what would drive the price and what we'd leave out.